/ ARCHIVE

The Work, Documented.

Sessions, meets, milestones. The record speaks.

/ AERO RANCH — CONSTRUCTION

Building the new home.

Progress from the Aero Ranch build-out. More to come as the facility takes shape.

/ ON-SITE WALKTHROUGH
Aero Ranch construction — pole vault box footing poured into the concrete floor.
/ VAULT BOX FOOTING
Aero Ranch construction — runway channels cut into the slab.
/ RUNWAY CHANNELS
/ BUILD UPDATE
Aero Ranch construction — freshly poured pole vault box footing set into the slab.
/ VAULT BOX POUR
Aero Ranch construction — Gill pole vault box installed in the concrete floor.
/ BOX INSTALL
Aero Ranch construction — roll of runway belting staged on the warehouse floor.
/ BELTING ROLL
Aero Ranch construction — runway belting laid out before installation.
/ BEFORE RUNWAY
Altitude 618 pole vault pit and standards at the end of the finished runway at Aero Ranch.
/ PIT & RUNWAY